New Construction #11.1, Acton is moving along now, but that wasn’t before finding out that our foundation was shot and needed to be torn down after we demo’d the house (surprise!).  If you remember, prior to demo, our engineer confirmed that the existing foundation would be strong enough to build on.  However, after the house was down the

Rehab #8, Wenham – 2nd Contract & 3rd Contract…

No Comments

This property has been under agreement three times but the buyers keep backing out.  Here is what we’re dealing with.. The land that we own is on two separate lots.  The lot with the house is on a nonconforming lot and the other lot (let’s call it Lot 2) is on a conforming lot but

Rehab #8, Wenham – 1st Contract

No Comments

As I mentioned in an earlier post, Rehab #8, Wenham has been completed and is on the market.  Well, after the first open house we heard a lot of buyers mention that the basement wasn’t up to par with the rest of the house.  So my partner and I decided to take it off the market for

Rehab #8, Wenham – Staging Pictures

1 Comment

I can’t even begin to express how happy I am that Rehab #8, Wenham is on the market!!  Pictures were taken over the weekend and we listed it on Monday.  We’ll just be adding a few finishing touches before the open house and first showing this Sunday.  This property has been an amazing rollercoaster and learning process from

Rehab #8, Wenham – Update & Pics

No Comments

I’m relieved to say that we are about 2 weeks away from finishing the rehab on the Wenham project.  This has been one of those projects that went way over budget and way over our scheduled timeline.  Thankfully, all we have remaining is the landscaping, finish plumbing & electrical, countertops, installing the carpet and some miscellaneous carpentry

Rehab #8, Wenham – Update & Pictures

2 Comments

Thankfully, this project has actually turned a corner and is moving in the right direction.  We’ve had our new GC on the job for the last couple of weeks and he has been doing great, working with the building inspector and an energy consultant to ensure we are doing everything by the book.  Now that we

Project Updates 12/2/13

2 Comments

It’s been a couple of weeks since I gave an update on my current rehabs.  Things have been progressing more slowly than my past rehabs which can be directly attributed to a number of factors.  I will elaborate in my next post but I can say that there will be some major changes to my

Project Updates & More

No Comments

Rehab #8, Wenham The work on this project has been on hold for about 1.5 weeks.  The building inspector came out to the project after we canned our original contractor (the scammer) and he had a number of concerns with the structural integrity of the building.  He asked that we get a structural engineer in

Rehab #12, Salem & Rehab #8, Wenham – Updates

No Comments

We closed on Rehab #12 last Thursday and my contractor has already finished the clean-out and stripped and reshingled the roof.  As I mentioned in a recent post, the house was previously occupied by hoarders so there was a ton of “stuff” that had to be hauled out.When I stopped by the property on Sunday and stepped out

Rehab #8, Wenham – More Issues

8 Comments

As I wrote in a previous post, the past several weeks at the Wenham project have brought nothing but bad news.  First, the roof had to be rebuilt due to insufficient framing, and then the back room due to considerable rot.  On top of all of that, I was given more bad news last week. 